SWR Systems With World Class Seals

Tecza piping systems has collaborated with a renowned company who manufacture triple-lip sealing rubber seals known as Forsheda 582 Dinlock. These seals along with Ultra fit SWR premium quality UPVC material ensure a long lasting performance. Ultra fit SWR with world class seals are used in building drainage of residential, commercial, industrial, & public complexes.

Pipes

Type A (Rubber Ring)

Single Socket
(6 ft.)
Double Socket
(6 ft.)
Single Socket
(3 Mtr.)
Double Socket
(3 Mtr.)
Double Socket
(4 ft.)
Double Socket
(3 ft.)
Double Socket
(2 ft.)
Size in mm Size in mm Size in mm Size in mm Size in mm Size in mm Size in mm
75mm 75mm 75mm 75mm 75mm 75mm 75mm
110mm 110mm 110mm 110mm 110mm 110mm 110mm

Type B (Rubber Ring)

Single Socket
(6 ft.)
Double Socket
(6 ft.)
Single Socket
(3 Mtr.)
Double Socket
(3 Mtr.)
Double Socket
(4 ft.)
Double Socket
(3 ft.)
Double Socket
(2 ft.)
Size in mm Size in mm Size in mm Size in mm Size in mm Size in mm Size in mm
75mm 75mm 75mm 75mm 75mm 75mm 75mm
110mm 110mm 110mm 110mm 110mm 110mm 110mm

Fittings

DIN LOCK Ring Fittings - ISI

Coupler

Coupler

Bend 87.5°

Bend 87.5°

Bend With Door

Bend With Door

Single Tee

Single Tee

Single Tee With Door

Single Tee With Door

Single Y 45°

Single Y 45°

Single Y 45° With Door

Single Y 45° With Door

Double Y 45°

Double Y 45°

Double Y 45° With Door

Double Y 45° With Door

Bend 45°

Bend 45°

Cleansing Pipe

Cleansing Pipe

Reducers

Reducers

Reducing Tee

Reducing Tee

Reducing Tee With Door

Reducing Tee With Door

Rubber Ring Joint

Rubber Ring Joint

Rubber Solvent Joint

Rubber Solvent Joint

Solvent Joint

Solvent Joint

Solvent Joint Fittings - ISI

Coupler

Coupler

Bend 87.5°

Bend 87.5°

Bend With Door

Bend With Door

Single T

Single T

Single T With Door

Single T With Door

Single Y 45°

Single Y 45°

Single Y 45° With Door

Single Y 45° With Door

Double Y 45°

Double Y 45°

Double Y 45° With Door

Double Y 45° With Door

Bend 45°

Bend 45°

Cleansing Pipe

Cleansing Pipe

Reducer

Reducer

Access / Socket Plug

Access / Socket Plug

Vent Cowl

Vent Cowl

Pipe Clip

Pipe Clip

Boss Connector

Boss Connector

Traps

Nahani Trap With Jali

Nahani Trap With Jali

Nahani Trap Without Jali

Nahani Trap Without Jali

Nahani Trap With Jali (One Piece)

Nahani Trap With Jali (One Piece)

Nahani Trap Without Jali (One Piece)

Nahani Trap Without Jali (One Piece)

P Trap

P Trap

Multi Floor Trap 4″ (Ht.)

Multi Floor Trap 4″ (Ht.)

Round Jali With Holder 6″

Round Jali With Holder 6″

Specifications

  Fittings Pipes
Material Unplasticized Polyvinyl
Chloride (UPVC)
Unplasticized Polyvinyl
Chloride (UPVC)
Colour Light Grey Light Grey
Reference Standards IS 14735 : 1999 IS 13592 : 2013
Working pressure
(kg/cm2)
Non Pressure Application Non Pressure Application
End Connections Rubber Ring & Solvent Joint Rubber Ring & Solvent Joint
Variants - Type 'A' & Type 'B'

Joining Methods

DO's

  • CUTTING

    It is imperative to mark the pipe from all sides so that pipe is cut with the help of a Hand Saw. It should be a right angle cut from all the sides. The cut piece should not be with burr on edges.

  • DEBURRING AND RIDGE REMOVAL

    Remove all the burrs and ridges accumulated on the inner as well as the outer edges of the pipe with the help of a deburring knife, file or abrasive paper.

  • CLEANING

    Thoroughly clean the pipe with dry cloth where the solvent cement is going to be applied, to avoid dust, dirt, oil, moisture and other foreign material during the installation process.

  • CHAMFERING

    After cutting, the pipe needs to be chamfered from the outer sides. It is advisable to provide approximately2 mm wide, 150 chamfer on spigot end.

  • DRYFIT TEST

    Before applying solvent cement, insert the pipe end into the socket of the next pipe or fitting to check that interference occurs at about 1/3 to 2/3 of the socket depth.

  • APPLICATION OF SOLVENT CEMENT

    Mark the pipe length to be inserted for jointing. Apply a liberal coat of solvent cement with the help of the brushon the marked surface.

  • JOINTING

    Push the pipe inside the fitting so that it goes inside it equally from all the sides. Wipe off excess solvent cement that comes out from all the edges. Hold the joint for to 2 minutes so that the jointing is perfect.

  • INSTALLATION AND COMMISSIONING

    Pipe line should be installed in proper alignment and along with necessary clamps.

    Pressure testing to be done before concealing work.

    Pressure testing may be carried out after a curing period of 24 hrs.

DONT's

  • CUTTING

    Do not cut slant/unevenly.

  • DEBURRING AND RIDGE REMOVAL

    Do not proceed with the installation of pipe without deburring.

  • CLEANING

    Do not join the pipes without cleaning the pipe ends.

  • CHAMFERING

    Do not proceed with installation of pipe without chamfering.

  • DRYFIT TEST

    Do not apply solvent cement without dryfit test.

  • APPLICATION OF SOLVENT CEMENT

    Do not apply excess solvent cement on the pipe and do not use solvent cement by hand.

  • JOINTING

    Do not use a hammer or half push the pipe.

  • FOR THREADED JOINTS

    Don't over tighten with pipe wrench.

  • INSTALLATION AND COMMISSIONING

    Avoid loose joints and misalignments.

    Pressure testing should not be done before 24 hrs of curing.