UPVC Plumbing Systems for Easy Installation

Easy fit UPVC plumbing system is a ‘LEAD-FREE’ solvent weld system designed for the distribution of potable water that is technically superior and offers many advantages over conventional G.I. Piping system. This system is easy to install and offers a long service life. It is used mainly for cold water applications in residential, Commercial and public complexes.

Tecza pipes are highly durable for UPVC pipes.

Pipes

Size
( in mm )
Sizes
( in inches )
Sch-40
(3 mtr)
Sch-40
(6 mtr)
Sch-80
(3 mtr)
Sch-80
(6 mtr)
15mm 1⁄2" 60 30 50 26
20mm 3⁄4" 44 24 36 18
25mm 1” 30 16 26 14
32mm 1 1⁄4" 24 12 18 10
40mm 1 1⁄2" 20 10 14 8
50mm 2” 14 8 10 6
65mm 2 1⁄2" 9 4 8 4
80mm 3” 7 3 6 3
100mm 4" 5 2 4 2
150mm 6" 2 1 2 1

Fittings

UPVC Brass Insert Fittings

M.T.A.

M.T.A.

F.T.A.

F.T.A.

Male Threaded Elbow

Male Threaded Elbow

Female Threaded Elbow

Female Threaded Elbow

Male Threaded Tee

Male Threaded Tee

Female Threaded Tee

Female Threaded Tee

Female Threaded Bush

Female Threaded Bush

UPVC Fittings

Coupler

Coupler

Elbow

Elbow

Elbow 45°

Elbow 45°

Equal Tee

Equal Tee

Union

Union

End Cap

End Cap

Four Way Tee

Four Way Tee

M.T.A.

M.T.A.

F.T.A.

F.T.A.

fit-end-plug

End Plug

fit-extended-end-plug

Extended End Plug

Pipe Clip

Pipe Clip

Tank Connector

Tank Connector

fit-tank-connector-molded

Tank Connector Moulded

Reducer

Reducer

Reducing Bush

Reducing Bush

Reducing Elbow

Reducing Elbow

Reducing Tee

Reducing Tee

fit-threaded-elbow-1

Threaded Elbow

fit-threaded-tee-1

Threaded Tee

Red. Female Threaded Adaptor

Red. Female Threaded Adaptor

Cross Over (Fabricated)

Cross Over (Fabricated)

Bend

Bend

Ball Valves

Ball Valves

Solvents

Solvent Cement

Tin

Tin

Tube

Tube

Specifications

  Fittings Pipes
Material Unplasticized Polyvinyl Chloride
(UPVC) with U.V. Resistance
Unplasticized Polyvinyl Chloride
(UPVC) with U.V. Resistance
Colour White White
Refernce Standards Sch- 80 as per ASTM D- 2467
Sch- 40 as per ASTM D- 2466
Sch- 40 , 80 & 120 s per
ASTM D- 1785
Working Temperature Upto 60 degree- Continous
Upto - 90 degree- Short Time-
upto 3 mins
Unplasticized Polyvinyl Chloride
(UPVC) with U.V. Resistance
End Connections Solvent sockets. For transition
joints, fittings with plastic theaded
& metal threaded inserts available
Solvent Joint

Joining Methods

DO's

  • CUTTING

    It is imperative to mark the pipe from all sides so that pipe is cut with the help of a Hand Saw. It should be a right angle cut from all the sides. The cut piece should not be with burr on edges

  • DEBURRING AND RIDGE REMOVAL

    Remove all the burrs and ridges accumulated on the inner as well as the outer edges of the pipe with the help of a deburring knife, file or abrasive paper.

  • CLEANING

    Thoroughly clean the pipe with dry cloth where the solvent cement is going to be applied, to avoid dust, dirt, oil, moisture and other foreign material during the installation process.

  • CHAMFERING

    After cutting, the pipe needs to be chamfered from the outer sides. It is advisable to provide approximately 2mm wide, 150 chamfer on spigot end

  • DRYFIT TEST

    Before applying solvent cement, insert the pipe end into the socket of the next pipe or fitting to check that interference occurs at about 1/3 to 2/3 of the socket depth.

  • APPLICATION OF SOLVENT CEMENT

    Mark the pipe length to be inserted for jointing. Apply a liberal coat of solvent cement with the help of the brushon the marked surface.

  • JOINTING

    Push the pipe inside the fitting so that it goes inside it equally from all the sides. Wipe off excess solvent cement that comes out from all the edges. Hold the joint for to 2 minutes so that the jointing is perfect.

  • FOR THREADED JOINTS

    Clean the Male & Female threads.

    Apply teflon tape in the direction of thread tightening.

    Hand-tighten the threads firmly.

    Tighten the joint more by using pipe wrench. Do not over tighten. Use rubber packing to avoid scratches on pipe.

DONT's

  • CUTTING

    Do not cut slant/unevenly.

  • DEBURRING AND RIDGE REMOVAL

    Do not proceed with the installation of pipe without deburring.

  • CLEANING

    Do not join the pipes without cleaning the pipe ends.

  • CHAMFERING

    Do not proceed with installation of pipe without chamfering.

  • DRYFIT TEST

    Do not apply solvent cement without dryfit test.

  • APPLICATION OF SOLVENT CEMENT

    Do not apply excess solvent cement on the pipe and do not use solvent cement by hand.

  • JOINTING

    Do not apply excess solvent cement on the pipe.

    Do not use a hammer or half push the pipes.

  • FOR THREADED JOINTS

    Don't over tighten with pipe wrench.

  • INSTALLATION AND COMMISSIONING

    Pipe line should be installed in proper alignment & along with necessary clamps.

    Pressure testing to be done before concealing work.

    Pressure testing may be carried out after a curing period of 24 hrs and should not be done before that.